Consisting of 30 turbines over 68 meters tall, Scroby Sands was one o of the first commercial wind farms, located in the North Sea 2.5km from the Cost of Great Yarmouth.
CCL UK LTD provided termination, jointing and testing services for all shorelink and array subsea cables, beach joints and sub-station patch boxes. These turbines provide enough energy to power 30,000 homes, saving nearly 68 thousand tonnes of carbon dioxide emissions each and every year.