The Norther offshore wind farm is a 370MW project approximately 23km off the Belgian coast, alongside the border with the Netherlands. Situated within the Exclusive Economic Zone of Belgium, the windfarm consists of 44 MHI Vestas 8MW wind turbines, which are capable of delivering a maximum output of 8.4MW. Each turbine has a rotor diameter of 164m and swept area of 21,124m².
CCL UK supplied company representatives and engineers to the cable replacement campaign.