Galloper Offshore Wind Farm is located approximately 30km off the coast of Suffolk, close to its sister project Greater Gabbard Wind Farm. Construction of Galloper Offshore Wind Farm started with onshore works in late 2015 with offshore construction getting underway in the summer of 2016. First power was generated by the wind farm in November 2017 and it became fully operational in March 2018.
CCL UK provided the Fibre Optic engineers and relevant equipment required for the completion of the Onshore Substation terminations and Transitions Joints. We also completed the final OTDR testing.